Entrance Goals

  • Realign Meadow Road to restore the historical curvature of the Olmsted design and improve views of the collections
  • Restore historic cobble gutters along Meadow Road
  • Prioritize the pedestrian experience with a continuous accessible surface at Arborway Gate
  • Enhance Hunnewell Building lawn plantings and pathway connections
  • Provide a gathering space with benches in front of the Hunnewell Building
  • Add bike parking and a bike repair station
  • Relocate portable restroom facilities
  • Coordinate entrance improvements with the DCR Arborway Parkways Improvement Project to best serve pedestrians and cyclists
Arborway Gate Concept – Michael Van Valkenburgh Associates, 2023Michael Van Valkenburgh Associates, 2023
Birds eye view of Arborway Gate existing condition
Existing Birds-eye View – Michael Van Valkenburgh Associates, 2023Michael Van Valkenburgh Associates, 2023
Bird's-eye view image of Arborway Gateproposed design
Proposed Bird’s-eye View – Michael Van Valkenburgh Associates, 2023Michael Van Valkenburgh Associates, 2023
Image of the existing condition of Arborway Gate arrival view
Existing Arrival View – Michael Van Valkenburgh Associates, 2023Michael Van Valkenburgh Associates, 2023
Image of the proposed arrival view of Arborway Gate
Proposed Arrival View – Michael Van Valkenburgh Associates, 2023Michael Van Valkenburgh Associates, 2023
Image of Arborway Gate existing departure view
Existing Departure View – Michael Van Valkenburgh Associates, 2023Michael Van Valkenburgh Associates, 2023
Image of Arborway Gate proposed departure view
Proposed Departure View – Michael Van Valkenburgh Associates, 2023Michael Van Valkenburgh Associates, 2023