Skip to content
1927 Map of the Arboretum

Walter Street Gate

Entrance Goals

  • Expand and enhance planting areas inside and outside of Walter Street Gate
  • Open center gate to pedestrian access to create a more welcoming entrance
  • Improve light levels, sight lines, and viewsheds through selective pruning of yews along the carriage road
  • Add bench seating with views of the conifer collection
  • Realign Hemlock Hill Road to restore the historical curvature of the Olmsted design
  • Restore historic cobble gutters along the carriage road
  • Add bike parking and portable bathroom facilities
  • Work with City of Boston to improve Arboretum visitor parking and add ADA parking along Bussey Street
Image of Walter Street Concept Design
Walter Street Gate Concept Michael Van Valkenburgh Associates, 2023
Existing Arrival View
Rendering of proposed Walter Street Gate entrance
Proposed Arrival View
Image of Walter Street Gate Existing Departure View
Existing Departure View Michael Van Valkenburgh Associates, 2023
Image of Walter Street Gate Proposed Departure View
Proposed Departure View Michael Van Valkenburgh Associates, 2023